Solution: • Continuous
installation system with • four
treatment zones • Zone
1 for positioning the carriers with the parts • and
cleaning the teeth using rotating • high-pressure
nozzles • Washing
and rinsing in conventional • multi-stage
process • Circulating
air drying at air speeds • up
to 60 m/sec
The
job involved the following tasks: • Cleaning
machined parts • Cleaning
after blasting • Defined
high-pressure cleaning of the narrow • internal
and external gear toothing • Parts
positioning during transport • Avoiding
any damage as the parts are conveyed • through
the machine • Loading
and unloading to be carried out by • one
operator • Compact
design • Easy
access to all system components